
Rooftop units, generators, tanks and other mechanical equipment must stay in place in wind and earthquakes, and the framing carrying them must be adequate. We design the supports, curbs, restraints and anchorage for the seismic and wind forces required by ASCE 7, check the supporting structure, and prepare stamped details for the permit.
Roof beams, joists and deck checked for the operating weight of the equipment and its supports.
Equipment forces from the nonstructural component provisions of ASCE 7 Chapter 13, based on mounting height and component importance.
Rooftop equipment wind forces from ASCE 7 and the restraint needed to resist them.
Anchor capacity in concrete, steel or wood, including edge distance and, for post-installed anchors in concrete, the required evaluation report.
Restraints that allow isolators to work without letting the equipment move under earthquake or wind loading.
Forces carried into the building structure rather than the roofing.